2.23 Fabricate Provisional Crown or Bridge
Protocol: The student will prepare temporary coverage for a tooth or teeth prepared to receive a crown or bridge.
Criteria:
Student completed procedure protocol accurately | Successful (S) |
Student did not complete procedure protocol accurately | Unsuccessful (U) |
Procedure Protocol |
Procedure Protocol |
Gathered the appropriate materials |
Fabricated a stent |
Coated the tooth with separating medium |
Dispensed adequate acrylic material to cover prepared teeth without excess waste |
Placed the material in the stent without causing air bubbles |
Placed the stent over the prepared tooth and held in place for two minutes. |
Removed the stent and placed provisional back on prepared tooth |
After curing was complete, removed all excess material with acrylic bur |
Margins of provisional are tapered and smooth and meet the crown preparation margin |
Provisional contacts the adjacent teeth (no open contacts) |
Completed final polish with pumice to a smooth finish |
Provided patient with post-operative instructions |
Safety measures followed |
Infection control protocols followed |
Demonstrates professionalism and appropriate communication skills |