2.16 Mixing Permanent Cements
Protocol: The student will assemble the necessary supplies, and correctly manipulate the materials.
Criteria:
Student completed procedure protocol accurately | Successful (S) |
Student did not complete procedure protocol accurately | Unsuccessful (U) |
Procedure Protocol |
Complete armamentarium assembled |
Dispensed materials for a crown cementing in correct sequence |
Incorporated pastes, or powder and liquid according to the manufacturer’s directions |
Completed mixes within the working time |
Zinc Phosphate cement was the correct consistency |
Glass Ionomer cement was the correct consistency |
Correct preparation and procedure for use of Resin Cement |
Lined crown with cement |
Cleaned instruments |
Safety measures followed |
Infection control protocols followed |
Demonstrates professionalism and appropriate communication skills |